Weitere Entscheidung unten: EGMR, 26.03.2009

Rechtsprechung
   EGMR, 05.12.2013 - 46344/06, 54215/08, 44036/02, 39444/08, 10732/05, 1479/08, 8453/04, 21965/09, 7634/05, 1126/05, 17878/04, 7369/04, 40014/05, 39778/07, 11171/08, 43336/08, 52719/08, 15895/09, 16123/09, 16127/09, 16129/09, 27529/09, 27533/09, 27596/09, 2693/07, 1679/03, 66   

Zitiervorschläge
https://dejure.org/2013,64465
EGMR, 05.12.2013 - 46344/06, 54215/08, 44036/02, 39444/08, 10732/05, 1479/08, 8453/04, 21965/09, 7634/05, 1126/05, 17878/04, 7369/04, 40014/05, 39778/07, 11171/08, 43336/08, 52719/08, 15895/09, 16123/09, 16127/09, 16129/09, 27529/09, 27533/09, 27596/09, 2693/07, 1679/03, 66 (https://dejure.org/2013,64465)
EGMR, Entscheidung vom 05.12.2013 - 46344/06, 54215/08, 44036/02, 39444/08, 10732/05, 1479/08, 8453/04, 21965/09, 7634/05, 1126/05, 17878/04, 7369/04, 40014/05, 39778/07, 11171/08, 43336/08, 52719/08, 15895/09, 16123/09, 16127/09, 16129/09, 27529/09, 27533/09, 27596/09, 2693/07, 1679/03, 66 (https://dejure.org/2013,64465)
EGMR, Entscheidung vom 05. Dezember 2013 - 46344/06, 54215/08, 44036/02, 39444/08, 10732/05, 1479/08, 8453/04, 21965/09, 7634/05, 1126/05, 17878/04, 7369/04, 40014/05, 39778/07, 11171/08, 43336/08, 52719/08, 15895/09, 16123/09, 16127/09, 16129/09, 27529/09, 27533/09, 27596/09, 2693/07, 1679/03, 66 (https://dejure.org/2013,64465)
Tipp: Um den Kurzlink (hier: https://dejure.org/2013,64465) schnell in die Zwischenablage zu kopieren, können Sie die Tastenkombination Alt + R verwenden - auch ohne diesen Bereich zu öffnen.

Volltextveröffentlichungen (2)

  • Europäischer Gerichtshof für Menschenrechte

    RUMPF ET 70 AUTRES AFFAIRES CONTRE L'ALLEMAGNE

    Informations fournies par le gouvernement concernant les mesures prises permettant d'éviter de nouvelles violations. Versement des sommes prévues dans l'arrêt (französisch)

  • Europäischer Gerichtshof für Menschenrechte

    RUMPF AND 70 OTHER CASES AGAINST GERMANY

    Information given by the government concerning measures taken to prevent new violations. Payment of the sums provided for in the judgment (englisch)

Hinweis zu den Links:
Zu grauen Einträgen liegen derzeit keine weiteren Informationen vor. Sie können diese Links aber nutzen, um die Einträge beispielsweise in Ihre Merkliste aufzunehmen.

Verfahrensgang

 
Sortierung



Kontextvorschau





Hinweis: Klicken Sie auf das Sprechblasensymbol, um eine Kontextvorschau im Fließtext zu sehen. Um alle zu sehen, genügt ein Doppelklick.

Wird zitiert von ... (25)Neu Zitiert selbst (23)

  • BVerfG, 13.08.2012 - 1 BvR 1098/11

    Erfolglose Verfassungsbeschwerde gegen die überlange Dauer eines

    Auszug aus EGMR, 05.12.2013 - 46344/06
    By ruling of 13 August 2012 (1 BvR 1098/11), the Federal Constitutional Court rejected as inadmissible a complaint because of the duration of social court proceedings at first instance for lack of a need for legal protection, pointing to the new Legal Redress Act.

    A further non-admission ruling was based on the initial proceedings which had been regarded as too long now having been concluded (order of 13 August 2012 (1 BvR 1098/11)).

  • BFH, 12.03.2013 - X S 12/13

    Keine Verkürzung der Sechs-Monats-Frist des § 198 Abs. 5 Satz 1 GVG - Fristbeginn

    Auszug aus EGMR, 05.12.2013 - 46344/06
    The rulings of the Federal Courts which have already been handed down since the new law came into force relate to the admissibility of other remedies (Federal Court of Justice, order of 29 November 2012, VIII ZB 49/12), granting legal aid in connection with damage actions (Federal Court of Justice: orders of 20 December 2012; III ZA 33/12; of 8 November 2012, III ZA 27/12; of 25 October 2012 - III ZB 64/12; of 27 June 2012, III ZB 45/12; Federal Finance Court: orders of 12 March 2013, X S 12/13 (PKH)); of 26 July 2012, X S 18/12 (PKH); obligation to have counsel in damage actions (Federal Finance Court, judgment of 6 February 2013, X K 11/12), the impact of the unreasonable length of proceedings in disciplinary proceedings (Federal Administrative Court, orders of 22 January 2013 - 2 B 89.11; of 30 August 2012 - 2 B 21.12; of 1 June 2012, 2 B 123.11; of 16 May 2012 - 2 B 3.12; judgment of 29 March 2012 - Federal Administrative Court 2 A 11.10), as well as the questions concerning the degree to which the excessive length of a set of proceedings can constitute grounds for the admission of an appeal on points of law only (Federal Finance Court, order of 9 January 2013, X B 114/12), and when a delay in proceedings in breach of the rule of law applies in criminal proceedings (Federal Court of Justice, order of 5 December 2012, 1 StR 531/12).
  • BVerfG, 28.01.2013 - 2 BvR 1912/12

    Keine verfassungsrechtlichen Bedenken gegen Rspr des BVerwG zur Berücksichtigung

    Auszug aus EGMR, 05.12.2013 - 46344/06
    By rulings of 28 January 2013 (2 BvR 1912/12), 20 June 2012 (2 BvR 1565/11) and 30 May 2012 (1 BvR 2292/11), the Federal Constitutional Court did not admit constitutional complaints because of excessive length of proceedings that had been lodged for adjudication since the applicants had omitted to lodge a damage action in accordance with section 198 subs.
  • BFH, 06.02.2013 - X K 11/12

    Vertretungszwang auch bei Entschädigungsklagen - Vereinbarkeit des

    Auszug aus EGMR, 05.12.2013 - 46344/06
    The rulings of the Federal Courts which have already been handed down since the new law came into force relate to the admissibility of other remedies (Federal Court of Justice, order of 29 November 2012, VIII ZB 49/12), granting legal aid in connection with damage actions (Federal Court of Justice: orders of 20 December 2012; III ZA 33/12; of 8 November 2012, III ZA 27/12; of 25 October 2012 - III ZB 64/12; of 27 June 2012, III ZB 45/12; Federal Finance Court: orders of 12 March 2013, X S 12/13 (PKH)); of 26 July 2012, X S 18/12 (PKH); obligation to have counsel in damage actions (Federal Finance Court, judgment of 6 February 2013, X K 11/12), the impact of the unreasonable length of proceedings in disciplinary proceedings (Federal Administrative Court, orders of 22 January 2013 - 2 B 89.11; of 30 August 2012 - 2 B 21.12; of 1 June 2012, 2 B 123.11; of 16 May 2012 - 2 B 3.12; judgment of 29 March 2012 - Federal Administrative Court 2 A 11.10), as well as the questions concerning the degree to which the excessive length of a set of proceedings can constitute grounds for the admission of an appeal on points of law only (Federal Finance Court, order of 9 January 2013, X B 114/12), and when a delay in proceedings in breach of the rule of law applies in criminal proceedings (Federal Court of Justice, order of 5 December 2012, 1 StR 531/12).
  • BVerwG, 22.01.2013 - 2 B 89.11

    Beamtenbeisitzer im gerichtlichen Disziplinarverfahren; Verwaltungszweig;

    Auszug aus EGMR, 05.12.2013 - 46344/06
    The rulings of the Federal Courts which have already been handed down since the new law came into force relate to the admissibility of other remedies (Federal Court of Justice, order of 29 November 2012, VIII ZB 49/12), granting legal aid in connection with damage actions (Federal Court of Justice: orders of 20 December 2012; III ZA 33/12; of 8 November 2012, III ZA 27/12; of 25 October 2012 - III ZB 64/12; of 27 June 2012, III ZB 45/12; Federal Finance Court: orders of 12 March 2013, X S 12/13 (PKH)); of 26 July 2012, X S 18/12 (PKH); obligation to have counsel in damage actions (Federal Finance Court, judgment of 6 February 2013, X K 11/12), the impact of the unreasonable length of proceedings in disciplinary proceedings (Federal Administrative Court, orders of 22 January 2013 - 2 B 89.11; of 30 August 2012 - 2 B 21.12; of 1 June 2012, 2 B 123.11; of 16 May 2012 - 2 B 3.12; judgment of 29 March 2012 - Federal Administrative Court 2 A 11.10), as well as the questions concerning the degree to which the excessive length of a set of proceedings can constitute grounds for the admission of an appeal on points of law only (Federal Finance Court, order of 9 January 2013, X B 114/12), and when a delay in proceedings in breach of the rule of law applies in criminal proceedings (Federal Court of Justice, order of 5 December 2012, 1 StR 531/12).
  • BFH, 09.01.2013 - X B 114/12

    Überlange Verfahrensdauer grundsätzlich kein Verfahrensmangel

    Auszug aus EGMR, 05.12.2013 - 46344/06
    The rulings of the Federal Courts which have already been handed down since the new law came into force relate to the admissibility of other remedies (Federal Court of Justice, order of 29 November 2012, VIII ZB 49/12), granting legal aid in connection with damage actions (Federal Court of Justice: orders of 20 December 2012; III ZA 33/12; of 8 November 2012, III ZA 27/12; of 25 October 2012 - III ZB 64/12; of 27 June 2012, III ZB 45/12; Federal Finance Court: orders of 12 March 2013, X S 12/13 (PKH)); of 26 July 2012, X S 18/12 (PKH); obligation to have counsel in damage actions (Federal Finance Court, judgment of 6 February 2013, X K 11/12), the impact of the unreasonable length of proceedings in disciplinary proceedings (Federal Administrative Court, orders of 22 January 2013 - 2 B 89.11; of 30 August 2012 - 2 B 21.12; of 1 June 2012, 2 B 123.11; of 16 May 2012 - 2 B 3.12; judgment of 29 March 2012 - Federal Administrative Court 2 A 11.10), as well as the questions concerning the degree to which the excessive length of a set of proceedings can constitute grounds for the admission of an appeal on points of law only (Federal Finance Court, order of 9 January 2013, X B 114/12), and when a delay in proceedings in breach of the rule of law applies in criminal proceedings (Federal Court of Justice, order of 5 December 2012, 1 StR 531/12).
  • BGH, 05.12.2012 - 1 StR 531/12

    Recht auf Verfahrensbeschleunigung (Beschleunigungsgebot; Bedeutung einer

    Auszug aus EGMR, 05.12.2013 - 46344/06
    The rulings of the Federal Courts which have already been handed down since the new law came into force relate to the admissibility of other remedies (Federal Court of Justice, order of 29 November 2012, VIII ZB 49/12), granting legal aid in connection with damage actions (Federal Court of Justice: orders of 20 December 2012; III ZA 33/12; of 8 November 2012, III ZA 27/12; of 25 October 2012 - III ZB 64/12; of 27 June 2012, III ZB 45/12; Federal Finance Court: orders of 12 March 2013, X S 12/13 (PKH)); of 26 July 2012, X S 18/12 (PKH); obligation to have counsel in damage actions (Federal Finance Court, judgment of 6 February 2013, X K 11/12), the impact of the unreasonable length of proceedings in disciplinary proceedings (Federal Administrative Court, orders of 22 January 2013 - 2 B 89.11; of 30 August 2012 - 2 B 21.12; of 1 June 2012, 2 B 123.11; of 16 May 2012 - 2 B 3.12; judgment of 29 March 2012 - Federal Administrative Court 2 A 11.10), as well as the questions concerning the degree to which the excessive length of a set of proceedings can constitute grounds for the admission of an appeal on points of law only (Federal Finance Court, order of 9 January 2013, X B 114/12), and when a delay in proceedings in breach of the rule of law applies in criminal proceedings (Federal Court of Justice, order of 5 December 2012, 1 StR 531/12).
  • BGH, 20.11.2012 - VIII ZB 49/12

    Zulässigkeit einer Untätigkeitsbeschwerde

    Auszug aus EGMR, 05.12.2013 - 46344/06
    The rulings of the Federal Courts which have already been handed down since the new law came into force relate to the admissibility of other remedies (Federal Court of Justice, order of 29 November 2012, VIII ZB 49/12), granting legal aid in connection with damage actions (Federal Court of Justice: orders of 20 December 2012; III ZA 33/12; of 8 November 2012, III ZA 27/12; of 25 October 2012 - III ZB 64/12; of 27 June 2012, III ZB 45/12; Federal Finance Court: orders of 12 March 2013, X S 12/13 (PKH)); of 26 July 2012, X S 18/12 (PKH); obligation to have counsel in damage actions (Federal Finance Court, judgment of 6 February 2013, X K 11/12), the impact of the unreasonable length of proceedings in disciplinary proceedings (Federal Administrative Court, orders of 22 January 2013 - 2 B 89.11; of 30 August 2012 - 2 B 21.12; of 1 June 2012, 2 B 123.11; of 16 May 2012 - 2 B 3.12; judgment of 29 March 2012 - Federal Administrative Court 2 A 11.10), as well as the questions concerning the degree to which the excessive length of a set of proceedings can constitute grounds for the admission of an appeal on points of law only (Federal Finance Court, order of 9 January 2013, X B 114/12), and when a delay in proceedings in breach of the rule of law applies in criminal proceedings (Federal Court of Justice, order of 5 December 2012, 1 StR 531/12).
  • BGH, 20.12.2012 - III ZA 33/12

    Antrag auf Bewilligung von Prozesskostenhilfe bei Einlegung eines unstatthaften

    Auszug aus EGMR, 05.12.2013 - 46344/06
    The rulings of the Federal Courts which have already been handed down since the new law came into force relate to the admissibility of other remedies (Federal Court of Justice, order of 29 November 2012, VIII ZB 49/12), granting legal aid in connection with damage actions (Federal Court of Justice: orders of 20 December 2012; III ZA 33/12; of 8 November 2012, III ZA 27/12; of 25 October 2012 - III ZB 64/12; of 27 June 2012, III ZB 45/12; Federal Finance Court: orders of 12 March 2013, X S 12/13 (PKH)); of 26 July 2012, X S 18/12 (PKH); obligation to have counsel in damage actions (Federal Finance Court, judgment of 6 February 2013, X K 11/12), the impact of the unreasonable length of proceedings in disciplinary proceedings (Federal Administrative Court, orders of 22 January 2013 - 2 B 89.11; of 30 August 2012 - 2 B 21.12; of 1 June 2012, 2 B 123.11; of 16 May 2012 - 2 B 3.12; judgment of 29 March 2012 - Federal Administrative Court 2 A 11.10), as well as the questions concerning the degree to which the excessive length of a set of proceedings can constitute grounds for the admission of an appeal on points of law only (Federal Finance Court, order of 9 January 2013, X B 114/12), and when a delay in proceedings in breach of the rule of law applies in criminal proceedings (Federal Court of Justice, order of 5 December 2012, 1 StR 531/12).
  • BGH, 08.11.2012 - III ZA 27/12

    Statthaftigkeit einer sofortigen Beschwerde gegen die Zurückweisung eines

    Auszug aus EGMR, 05.12.2013 - 46344/06
    The rulings of the Federal Courts which have already been handed down since the new law came into force relate to the admissibility of other remedies (Federal Court of Justice, order of 29 November 2012, VIII ZB 49/12), granting legal aid in connection with damage actions (Federal Court of Justice: orders of 20 December 2012; III ZA 33/12; of 8 November 2012, III ZA 27/12; of 25 October 2012 - III ZB 64/12; of 27 June 2012, III ZB 45/12; Federal Finance Court: orders of 12 March 2013, X S 12/13 (PKH)); of 26 July 2012, X S 18/12 (PKH); obligation to have counsel in damage actions (Federal Finance Court, judgment of 6 February 2013, X K 11/12), the impact of the unreasonable length of proceedings in disciplinary proceedings (Federal Administrative Court, orders of 22 January 2013 - 2 B 89.11; of 30 August 2012 - 2 B 21.12; of 1 June 2012, 2 B 123.11; of 16 May 2012 - 2 B 3.12; judgment of 29 March 2012 - Federal Administrative Court 2 A 11.10), as well as the questions concerning the degree to which the excessive length of a set of proceedings can constitute grounds for the admission of an appeal on points of law only (Federal Finance Court, order of 9 January 2013, X B 114/12), and when a delay in proceedings in breach of the rule of law applies in criminal proceedings (Federal Court of Justice, order of 5 December 2012, 1 StR 531/12).
  • BGH, 25.10.2012 - III ZB 64/12

    Antrag auf Bewilligung von Prozesskostenhilfe für eine Beschwerde gegen

  • BVerwG, 30.08.2012 - 2 B 21.12

    Garantie des gesetzlichen Richters; dienstliche Überbeanspruchung des Richters;

  • BFH, 26.07.2012 - X S 18/12

    Entschädigungsklage wegen überlanger Verfahrensdauer - Laufzeit bis zu einem Jahr

  • BVerfG, 20.06.2012 - 2 BvR 1565/11

    Unzulässigkeit einer Verfassungsbeschwerde wegen Subsidiarität sowie mangels

  • BVerwG, 01.06.2012 - 2 B 123.11

    Zur Bedeutung einer unangemessen langen Dauer des Disziplinarverfahrens

  • BVerfG, 30.05.2012 - 1 BvR 2292/11

    Unzulässigkeit der Rüge einer unangemessenen Verfahrensdauer mangels

  • BGH, 27.06.2012 - III ZB 45/12

    Zurückweisung eines Prozesskostenhilfegesuchs in Entschädigungssachen:

  • BVerwG, 16.05.2012 - 2 B 3.12

    Unerlaubtes Fernbleiben vom Dienst; Zweck der Disziplinarbefugnis; Verwirkung;

  • BVerwG, 11.07.2013 - 5 C 27.12

    Enteignungsentschädigung; Entschädigung; angemessene -; Entschädigungsanspruch;

  • BVerwG, 11.07.2013 - 5 C 23.12

    Entschädigung; angemessene -; Entschädigungsanspruch; Entschädigungsanspruch bei

  • OLG Celle, 24.10.2012 - 23 SchH 3/12

    Ansprüche wegen überlanger Dauer eines Ermttlungs- und des anschließenden

  • OVG Sachsen-Anhalt, 25.07.2012 - 7 KE 1/11

    Entschädigung für überlange Verfahrensdauer

  • EGMR, 02.09.2010 - 46344/06

    Beschwerderecht gegen lange Verfahren gefordert

  • EGMR, 10.09.2010 - 31333/06

    McFARLANE v. IRELAND

    The Court recalls its constant case law to the effect that the reasonableness of the length of proceedings must be assessed in the light of the circumstances of the case and with reference to the following criteria: the complexity of the case, the conduct of the applicant and of the relevant authorities and what was at stake for the applicant (for example, Sürmeli v. Germany [GC], no. 75529/01, § 128, ECHR 2006-VII).

    "Remedies available to a litigant at domestic level for raising a complaint about length of proceedings are "effective"... if they prevent the alleged violation or its continuation, or provide adequate redress for any violation that has already occurred (Scordino v. Italy (no. 1) [GC], no. 36813/97, ECHR 2006-V; Sürmeli v. Germany [GC], no. 75529/01, § 65, ECHR 2006-VII; and Kudla v. Poland, cited above, §§ 157 to 159).

  • LSG Niedersachsen-Bremen, 17.12.2013 - L 10 SF 28/13
    Mit Urteil vom 16. Dezember 2010 hat der EGMR in den zusammengefassten Individualbeschwerdeverfahren des Klägers Nrn. 39778/07, 11171/08, 43336/08, 52719/08, 15895/09, 16123/09, 16127/09, 16129/09, 27529/09, 27533/09 und 27596/09 die beklagte Bundesrepublik Deutschland verurteilt, an den Kläger einmalig 30.000 EUR immateriellen Schadensersatz zu zahlen.
  • LSG Niedersachsen-Bremen, 29.08.2013 - L 10 SF 22/13
    Mit Urteil vom 16. Dezember 2010 hat der EGMR in den zusammengefassten Individualbeschwerdeverfahren des Klägers Nrn. 39778/07, 11171/08, 43336/08, 52719/08, 15895/09, 16123/09, 16127/09, 16129/09, 27529/09, 27533/09 und 27596/09 die beklagte Bundesrepublik Deutschland verurteilt, an den Kläger einmalig 30.000 EUR immateriellen Schadensersatz zu zahlen.
Haben Sie eine Ergänzung? Oder haben Sie einen Fehler gefunden? Schreiben Sie uns.

Rechtsprechung
   EGMR, 26.03.2009 - 7369/04   

Zitiervorschläge
https://dejure.org/2009,30013
EGMR, 26.03.2009 - 7369/04 (https://dejure.org/2009,30013)
EGMR, Entscheidung vom 26.03.2009 - 7369/04 (https://dejure.org/2009,30013)
EGMR, Entscheidung vom 26. März 2009 - 7369/04 (https://dejure.org/2009,30013)
Tipp: Um den Kurzlink (hier: https://dejure.org/2009,30013) schnell in die Zwischenablage zu kopieren, können Sie die Tastenkombination Alt + R verwenden - auch ohne diesen Bereich zu öffnen.

Volltextveröffentlichungen (3)

 
Sortierung



Kontextvorschau





Hinweis: Klicken Sie auf das Sprechblasensymbol, um eine Kontextvorschau im Fließtext zu sehen. Um alle zu sehen, genügt ein Doppelklick.

Wird zitiert von ... (5)Neu Zitiert selbst (3)

  • BVerfG, 31.03.1998 - 1 BvR 2167/93

    Altersgrenze für Kassenärzte ist verfassungsgemäß

    Auszug aus EGMR, 26.03.2009 - 7369/04
    Nach der Rechtsprechung des Bundesverfassungsgerichts (siehe Entscheidung vom 31. März 1998, 1 BvR 2167/93 und 1 BvR 2198/93) ist § 95 Abs. 7 Sozialgesetzbuch mit der grundgesetzlich garantierten Berufsfreiheit von Ärzten, mit deren Eigentumsrechten und mit dem Gleichheitsgrundsatz vereinbar.
  • EGMR, 28.06.1978 - 6232/73

    König ./. Deutschland

    Auszug aus EGMR, 26.03.2009 - 7369/04
    Der zu berücksichtigende Zeitraum begann am 27. Juli 1998 mit der Widerspruchseinlegung durch den Beschwerdeführer (siehe u.a. J. ./. Deutschland, Individualbeschwerde Nr. 23959/94, Randnr. 40, 20. Dezember 2001, und K. ./. Deutschland, Urteil vom 28. Juni 1978, Serie A Band 27, Randnr. 98) und endete am 23. September 2003 mit der Zustellung der Entscheidung des Sozialgerichts Hamburg an den Beschwerdeführer.
  • EGMR, 27.06.2000 - 30979/96

    FRYDLENDER c. FRANCE

    Auszug aus EGMR, 26.03.2009 - 7369/04
    Der Gerichtshof weist erneut darauf hin, dass die Angemessenheit der Verfahrensdauer im Lichte der Umstände der Rechtssache sowie unter Berücksichtigung folgender Kriterien zu beurteilen ist: die Komplexität des Falles, das Verhalten des Beschwerdeführers und der zuständigen Behörden sowie die Bedeutung des Rechtsstreits für den Beschwerdeführer (s. u.v.a. Frydlender ./. Frankreich [GK], Individualbeschwerde Nr. 30979/96, Randnr. 43, ECHR 2000-VII).
  • OVG Sachsen-Anhalt, 25.07.2012 - 7 KE 1/11

    Entschädigung für überlange Verfahrensdauer

    (EGMR, Entscheidung vom 30. Juni 2011, Nr. 11811/10, Rdnr. 28; Entscheidung vom 26. März 2009, Nr. 7369/04, Rdnr. 31).
  • LSG Baden-Württemberg, 30.04.2014 - L 2 SF 3694/12
    nicht sonderlich bzw. besonders komplex ("not particularly complex"; EGMR, Urteil vom 30. Juni 2011, Nr. 11811/10, Rdnr. 28; Entscheidung vom 26. März 2009, Nr. 7369/04, Rdnr. 31) 2. gewisse sachliche und/oder rechtliche Komplexität ("certain complexity"; EGMR, Urteil vom 10. Februar 2011, Nr. 1521/06, Rdnr. 65) 3. ziemlich komplexe Sach- und Rechtsfragen bzw. erhebliche Komplexität ("considerable complexity"; EGMR, Urteil vom 29. Juni 2010, Nr. 29035/06, Rdnr. 56; Urteil vom 11. Januar 2007, Nr. 20027/02, Rdnr. 76; Urteil vom 26. März 2009, Nr. 20271/05, Rdnr. 64) 4. sehr komplex ("very complex"; EGMR, Urteil vom 25. September 2007, Nr. 71475/01, Rdnr. 172: Sorgerechtsverfahren) 5. sehr große Komplexität der Sache ("great complexity of the case"; EGMR, Urteil vom 2. März 2005, Nr. 71916/01 u. a., Rdnr. 131: Bodenreformgesetz).
  • FG Rheinland-Pfalz, 17.12.2010 - 6 V 1924/10

    Aussetzung der Vollziehung: Ernstliche Zweifel an der Rechtmäßigkeit einer

    Mit Urteil vom 26.03.2009 hat er in der Sache Nr. 7369/04 auch eine Verfahrensdauer von 5 Jahren und 2 Monaten als zu lang angesehen, obwohl in diesem Fall eine Verzögerung von 2 Jahren durch den Kläger verursacht worden war.
  • LSG Baden-Württemberg, 15.05.2013 - L 2 SF 1534/12
    nicht sonderlich bzw. besonders komplex ("not particularly complex"; EGMR, Urteil vom 30. Juni 2011, Nr. 11811/10, Rdnr. 28; Entscheidung vom 26. März 2009, Nr. 7369/04, Rdnr. 31) 2. gewisse sachliche und/oder rechtliche Komplexität ("certain complexity"; EGMR, Urteil vom 10. Februar 2011, Nr. 1521/06, Rdnr. 65) 3. ziemlich komplexe Sach- und Rechtsfragen bzw. erhebliche Komplexität ("considerable complexity"; EGMR, Urteil vom 29. Juni 2010, Nr. 29035/06, Rdnr. 56; Urteil vom 11. Januar 2007, Nr. 20027/02, Rdnr. 76; Urteil vom 26. März 2009, Nr. 20271/05, Rdnr. 64) 4. sehr komplex ("very complex"; EGMR, Urteil vom 25. September 2007, Nr. 71475/01, Rdnr. 172: Sorgerechtsverfahren) 5. sehr große Komplexität der Sache ("great complexity of the case"; EGMR, Urteil vom 2. März 2005, Nr. 71916/01 u. a., Rdnr. 131: Bodenreformgesetz).
  • FG Münster, 27.08.2014 - 13 K 4136/11

    Anerkennung eines Mietvertrages zwischen nahen Angehörigen und Verwirkung des

    Der EGMR habe dies bereits bei einer Verfahrensdauer von fünf Jahren und zwei Monaten angenommen (EGMR-Urteil vom 26.3. 2009 7369/04, juris).
Haben Sie eine Ergänzung? Oder haben Sie einen Fehler gefunden? Schreiben Sie uns.
Sie können auswählen (Maus oder Pfeiltasten):
(Liste aufgrund Ihrer bisherigen Eingabe)
Komplette Übersicht